In Singapore, technology buyers are now asked a question that has not yet reached Washington: how much of the stack is East, and how much is West?
Policymakers in Singapore, Seoul, Delhi, Tokyo, Paris and across Europe now ask it routinely. Few want to choose. Most are already choosing, one procurement at a time.
In Washington, the question is rarely asked. This paper sets out what the rest of the world sees, what continued inattention will cost, and what can still be built.
September 2026
The Fork
AI is more than algorithms. It is power, chips, data and models.
Each is a layer of national infrastructure. The two leading powers are strong in different layers, and no country leads them all.
China generates more than twice the electricity of the US, and added 429 GW of new capacity in 2024 against 51 GW.
The US holds about 72% of the AI compute installed worldwide since 2022. China holds about 10%, including its own chips.
Whoever runs the stack decides whose law reaches the data: the US CLOUD Act or China's National Intelligence Law.
US labs lead the closed frontier. Chinese labs lead open models: 64% of downloads among Hugging Face's top 300 text models.
That is why the unit of competition is the stack, not the algorithm, and why the market for it is splitting.
One AI market is becoming two.
Until recently, any country could buy any layer from anyone. That market is splitting into a Western stack and a Chinese one, and a country that picks one increasingly gives up the other. Both choices carry a real cost.
Price gap: open-weight API list prices averaged about one-eighth of closed (OpenRouter study, May–Sep 2025). Electricity: Huawei's CloudMatrix 384 delivers about 1.6x the dense compute of Nvidia's GB200 NVL72 at roughly 5x the power, about 3x the power per unit of compute (SemiAnalysis estimates via The Register).
The split is already costing the Western column money. Nvidia's chief executive put China at about a $50 billion opportunity for Nvidia in 2025, growing around 50% a year. The company's guidance now assumes no China data-centre revenue at all. Twice, markets have repriced the whole Western stack on news from the other one.
Every country that follows China's developers onto the Eastern stack makes the Western market smaller, for chipmakers, clouds, model labs and the allied suppliers beneath them. The next question is why it is happening, and why so fast.
Two Clocks
America plans by the quarter. China plans by the decade.
Investors judge American AI companies every three months. American chip policy changes with each administration, and sometimes within one. China set its AI goal in 2017, to lead the world by 2030, and has funded it every year since.
| United States | China | |
|---|---|---|
| 2017 | National AI plan: world leader by 2030 | |
| 2022 | ▲ Export controls on AI chips begin | |
| 2023 | ▲ Loophole for China-specific chips closed | |
| 2024 | $47.5 billion national chip fund | |
| 2025 | ▲ Nvidia's China chip restricted ▼ Global chip-allocation rule scrapped ▲ New rule on China-linked firms adopted… ▼ …then suspended two months later ▼ Nvidia sales re-allowed, for a 25% cut | "AI+" plan sets targets for 2027, 2030 and 2035 Firms told to stop buying Nvidia |
| 2026 | ▼ Suspension extended again, to January 2027 | 15th Five-Year Plan adopted Draft ¥2 trillion (~$280 billion) compute grid to 2030 Huawei publishes chip roadmap to 2028 |
▲ tightened · ▼ loosened, paused or reversed. US: Oct 2022 controls; Oct 2023 H800 loophole closed; Apr 2025 H20 restricted; May 2025 AI Diffusion Rule rescinded; Sep 2025 Affiliates Rule adopted; Nov 2025 Affiliates Rule suspended; Dec 2025 H200 sales allowed for a 25% revenue share; Nov 2026 suspension extended. The ¥2 trillion grid is a draft plan.
The long clock comes with a budget. Beijing subsidises every layer of its stack at once: the chips, the electricity they burn, the compute rented on them, and the open models that run on top. Washington subsidises fabs, and almost nothing above them.
| Layer | China | United States |
|---|---|---|
| Chips | $47.5B Big Fund III (2024), on top of two earlier funds | CHIPS Act: $39B for fabs, not for AI chip design or adoption |
| Power | Up to 50% off electricity for data centres that run domestic chips | None targeted |
| Compute | Vouchers in 17+ cities; Shanghai covers up to 80% of AI rental costs | NAIRR pilot, largely donated capacity |
| Grid | Draft ¥2 trillion national compute grid, 2026–30 | Left to private capex |
| Models | Open weights, free, from labs aligned with the "AI+" targets for 2027, 2030, 2035 | $152M to Ai2's fully open models |
| Demand | State firms told to stop buying Nvidia | Export rule changed 8 times in 4 years |
Power discounts reported by the Financial Times (Nov 2025) in Gansu, Guizhou and Inner Mongolia, for ByteDance, Alibaba and Tencent data centres using Huawei and Cambricon chips; not officially confirmed. Compute vouchers per RAND and Tom's Hardware. The ¥2T grid is a draft plan.
China is not competing on price. It is paying the price, for a decade, to own the default.
Subsidise. Overbuild. Undercut. Export. It worked on solar and EVs. AI is next.
China has run this play before. Subsidies took it to more than 80% of every stage of solar manufacturing. An estimated $231 billion of support built its EV industry from 2009 to 2023. Western makers did not lose on quality. They lost on price, to a rival whose state absorbed the losses.
In AI, the price is already through the floor.
Official list prices as compiled in April 2026; GPT-5.5 at preview pricing. Not like-for-like: the US frontier models are stronger. The point is the floor. And the Chinese weights are free to download and run at cost.
Beijing does not need to beat America's best model. It needs to make it unprofitable.
This is where it stops being a tech story.
America runs a current-account deficit near 4% of GDP and owes the rest of the world a net $21 trillion, about 70% of GDP. The world funds that by buying American assets, and what it is buying now is AI. Net foreign purchases of US stocks are approaching $900 billion a year, the most in three decades of data. Apollo's chief economist warns that if AI disappoints, the dollar is exposed. A subsidised rival that turns AI into a commodity is exactly how AI disappoints.
- Beijing subsidises the stackChips, power, compute and free open weights.
- AI's price falls toward zeroThe cheapest capable models are now Chinese, at about 1% of the US price.
- US AI margins compressThe business case behind $725B of 2026 capex rests on charging for intelligence.
- US AI valuations repriceTen companies are 38% of the S&P 500. It has happened twice already.
- Foreign capital slowsThe ~$900B a year flowing into US stocks is largely a bet on American AI.
- The dollar loses its propA $21 trillion net debt to the world, financed by a bet that a subsidised rival is working to break.
The market has already priced this twice
In January 2025, a single Chinese open-weight release removed roughly $589 billion from Nvidia's market capitalisation in one session — the largest one-day loss in US stock market history. In July 2026, on AI financing and China competition concerns, chip names shed more than $1 trillion combined, with the SOX falling as much as 29% from its June peak.
Neither event was a demand shock. Both were repricings of the same question: whether the American stack can hold the global default. That question is currently being answered at the open-model layer, which no American institution is funded to defend.
A funded open layer would cost a low single-digit fraction of one quarter's hyperscaler capex.
The exposure it protects is measured in tens of trillions, and in the currency itself.
The Flip
In under three years, the builders moved: to Chinese models, and to China.
In August 2024, Meta's Llama was the starting point for 44% of new open models built on Hugging Face. By summer 2025, Chinese open models had overtaken American ones. By February 2026, Qwen alone was the base for 69% of new models, and Meta for about 11%. As of 4 November, Chinese models take 64% of downloads among Hugging Face's 300 most-downloaded text models. American models take 30%.
The East West Index is the November 2026 reading. Earlier points come from two related measures, labelled on the chart. Share of new derivative models by base family: Meta 44% (Aug 2024), Qwen 69% and Meta ~11% (Feb 2026), ATOM Project. Share of new fine-tunes built on Chinese base models: 63% (Sep 2025), Stanford HAI. Share of downloads among Hugging Face's top 300 text-generation models by country of origin: China 64.1%, US 30.0% (4 Nov 2026 snapshot, independent analysis). The summer-2025 crossover is from the ATOM Report.
The people moved too. Carnegie traced the authors of every paper accepted at NeurIPS 2025, the field's top research conference. 57% took their first degree in China, up from 46% in 2022. And for the first time, more of them work in China (41%) than in the US (34%). In 2022, the US led 46% to 27%.
Carnegie study of authors with papers accepted at NeurIPS 2022 and NeurIPS 2025 (25,677 authors in 2025; more than 10,000 career histories traced), reported September 2026. Share of the tracked researchers by country of work.
For a developer platform, this is practically overnight, and defaults compound. Every developer who fine-tunes on a Chinese base model leaves behind tooling, evaluations and tutorials that make the next developer's choice easier.
They did not start from nothing. It took America twenty years to build the base they started on. It changed hands in eighteen months.
Nvidia disclosed the $26 billion, five-year open-weight commitment in an SEC filing reported in March 2026. US public support is far smaller: NSF and NVIDIA committed $152 million to Ai2's fully open OMAI programme.
A single company is now doing the job of a national strategy, on a five-year clock, against a country that already runs on one.
Export controls won the year. They may have cost the decade.
Every export decision since 2022 was scored on a one-year clock: did China get the chips? On that clock, the controls largely worked.
On a ten-year clock they made a different decision. Nvidia booked $19.7 billion of China revenue in fiscal 2026. Its guidance now assumes no China data-centre revenue at all. That demand did not disappear. It went to Huawei, which shipped about 812,000 Ascend chips in 2025 and is projected to book roughly $12 billion in AI processor revenue this year. ByteDance alone committed $5.6 billion. Beijing then told domestic firms to stop buying Nvidia.
AMD lost the same market: its China-specific MI308 was blocked in 2025 at a cost of up to $800 million. Nvidia wrote off $4.5 billion of H20 inventory in the same move.
Every dollar not spent on Nvidia or AMD is a dollar spent on Huawei's next chip.
The policy did not just deny compute. It decided which platform China's developers build on, and it funded the company building it.
Nvidia's FY2026 figure is total China and Hong Kong revenue across segments, not data centre alone; current guidance excludes China data-centre compute entirely. Huawei's 2025 figure is implied from the reported ~60% growth to its 2026 estimate.
The one-year clock asks whether China got the chips. The ten-year clock asks what the money and the developers did instead. Each stage is sourced in the brief; the loop is the argument, not a model.
Washington has since reversed course, licensing H200 sales for a 25% revenue share. Roughly $10 billion of licences have shipped almost nothing. The reversal came after the switching costs had already set. Nvidia's chief executive called the controls "a failure" and said they gave Chinese firms "the spirit, the energy, and the government support to accelerate." He has an interest in saying so. The revenue figures say the same thing without one.
We did not just stop selling chips. We chose what the world's largest AI talent pool builds on.
Own or Rent
Four companies will spend $725 billion this year. Almost none of it reaches the layer the world can adopt.
Amazon, Microsoft, Alphabet and Meta are guiding to roughly $725 billion of combined capex in 2026. It is private money, and it buys closed models behind metered APIs: something a foreign ministry cannot hold, inspect or host on its own soil.
For an American lab, the model is the revenue. Publish the weights and the margin goes to whoever serves them. So the open layer has no owner on any American balance sheet. In China, open weights are the distribution strategy: they bring the customer in, and paid cloud inference is where the margin comes from. Alibaba's cloud revenue grew 34% to ¥158 billion in FY2026.
The missing piece is not another base model. Frontier capability has moved into post-training: reinforcement learning, verifiers, agentic environments. US frontier labs do it best and keep it closed. Chinese open labs ship it. Everyone else has strong base models and a fragmented reinforcement loop. US public support exists but is small. NSF and NVIDIA committed $152 million to Ai2's fully open OMAI programme.
Scores as reported by Artificial Analysis at or around each release; the index is updated over time, so treat the gap as indicative. Reflection's Beam (announced October 2026) claims parity with GLM-5.2, unverified, with weights to follow.
America's open models are real and improving: Thinking Machines' Inkling, Nvidia's Nemotron, Ai2's fully open Olmo, and Reflection's Beam, announced in October. Europe has Mistral. But they trail, and Hugging Face notes that even Inkling draws on artifacts from Chinese labs.
Simplified. Some US firms release open weights (Meta, NVIDIA, OpenAI's gpt-oss, Ai2), but for a lab whose revenue is the model, publishing frontier weights works against its own business.
Funding one more open base model solves the layer that is already solved. The unowned layer is the reinforcement loop on top of it.
Critical systems cannot run on AI they cannot own.
AI is becoming the operating layer of government services, banks, insurers, airlines, hospitals and telecoms. Across these domains, closed versus open is existential. A system a country depends on cannot sit behind a model it cannot host, inspect, freeze or leave.
Tax, benefits, identity. Citizen data stays in-country, under national law, not a foreign vendor's terms.
Regulators require validated, auditable models and a tested exit from critical tech vendors (EU DORA, Art. 28).
Operations cannot stop because a vendor retired a model, changed its behaviour or went down.
Patient records cannot leave the jurisdiction, and clinical tools must be explainable to a regulator.
Cannot depend on another government's licence, or its ability to compel a provider.
Critical national infrastructure. Every dependency is an attack surface.
| Requirement | US closed | Chinese open | US & allied open | Third stack |
|---|---|---|---|---|
| Host in-country | ◐ | ✓ | ✓ | ✓ |
| Inspect and audit the model | ✗ | ✓ | ✓ | ✓ |
| Freeze a version for years | ✗ | ✓ | ✓ | ✓ |
| Exit without rebuilding | ✗ | ✓ | ✓ | ✓ |
| Trusted supply chain and provenance | ✓ | ✗ | ✓ | ✓ |
| Near-frontier capability | ✓ | ✓ | ◐ | to build |
| Funded to keep up | ✓ | ✓ | ✗ | to fund |
◐ partial: US closed models can run in-region on a hyperscaler's sovereign cloud, but the vendor holds the weights and sets the update schedule. US and allied open models (Inkling, Nemotron, Olmo, Mistral) meet the ownership tests but trail on capability and have no sustained public funding.
Read the table by column. The closed stack fails the ownership test. The Chinese stack passes it, at near-frontier strength, and fails on trust. The allied open stack passes both and is not funded to keep up. That is why the ministries are moving: the only option that is both capable and ownable today is Chinese.
A stack only counts if others can adopt it. They can only adopt what they can own.
Power
America has the compute. China has the power.
Measured in compute, the US is far ahead. It received about 72% of all AI compute delivered worldwide from 2022 to mid-2026. China received about 10%, counting its own Huawei and Cambricon chips.
Epoch AI chip imports explorer (October 2026): 27.4 million H100-equivalents delivered worldwide from 2022 to June 2026, 19.8 million to the US and 2.6 million to China (range 1.9–4.2 million; about 40% of China's total is domestic chips; smuggled chips are likely undercounted). Converted at roughly one dense BF16 petaflop per H100-equivalent.
But compute is chips multiplied by electricity, and on electricity the lead runs the other way. America's constraint is new power: grid interconnection in Northern Virginia, Phoenix and Dallas takes four to seven years, seven in ten Americans oppose new data centres in their communities, and New York has a statewide moratorium.
China's advantage is electricity
The electricity gap is not a forecast. China already generates more than twice as much as the US, and the gap is widening.
China is also building new ultra-high-voltage transmission corridors, while the US is largely working to extract more capacity from corridors it already has.
Cheap, abundant power lets weaker chips compete. Huawei's CloudMatrix 384 links 384 Ascend chips to deliver about 1.6 times the dense compute of Nvidia's 72-GPU flagship rack, while drawing roughly five times the power. Chip for chip it is far behind. With enough electricity, it does not need to be.
The honest qualification: this is not a clean sweep. Analysis from the Oxford Institute for Energy Studies notes that Chinese electricity prices are broadly comparable to American ones, and that the system carries its own institutional bottlenecks, rigid pricing and regional approval frictions. Abundant generation is not the same as frictionless deployment.
Grid interconnection waits in Northern Virginia, Phoenix and Dallas are reported at four to seven years. Every physical layer of the Western column runs on a multi-year clock. The model layer does not — which is the single most important asymmetry on this page.
Two conclusions follow. First, closing the open-model gap does not need a single new data centre. The US already holds most of the world's AI compute, nearly all of it serving closed models and commercial inference. What the open layer needs is an allocation of that capacity.
Second, the long-run answer to a rival with more power cannot be more power. It has to be efficiency: more intelligence per watt, so that allied compute goes further than cheap electricity can.
America will keep the most compute. That wins nothing if none of it reaches the layer the world adopts.
The Bets
Six dated predictions.
Each states its basis and the evidence that would falsify it.
Power is already lost, and the gap widens through 2030.
China adds more generating capacity every year than the US, and US data centres hit a power wall China does not. Expect a US data-centre shortfall in the tens of gigawatts by 2028.
Rests on 429 GW added in China in 2024 vs 51 GW in the US; ~400 GW of Chinese spare capacity by 2030; Morgan Stanley's 44 GW US shortfall estimate. Wrong if the US gas build lands: US gas capacity in development rose from 252 to 378 GW in 2026, now twice China's.
America keeps the compute lead through 2030. It will not be enough.
We will win the FLOPs and lose the default. US data centres run 56 GW to China's 24, and Huawei stays three to four years behind Nvidia per chip. None of that moves the open layer unless capacity is allocated to it.
Rests on SemiAnalysis capacity estimates; Epoch's Huawei roadmap (2028 output a few percent of Nvidia's). Wrong if the closed frontier pulls so far ahead that open stops mattering.
Without a funded open layer, the East West Index holds above 60 East through 2027, and West falls below 25.
Defaults compound. Every fine-tune on a Chinese base makes the next one easier.
Rests on 44% → 11% for Meta in 18 months; 64 / 30 today. Wrong if Nvidia's $26 billion, Inkling or Beam turn the Index on their own.
By the end of 2027, most new national models outside the US and China are built on Chinese bases.
Countries building "sovereign" models will start from whatever is best, open and free. Today that is Chinese.
Rests on Singapore's SEA-LION already built on Qwen; Qwen the base for 69% of new derivatives. Wrong if a capable allied open base ships with long-term support.
By 2028, today's frontier capability costs under 1% of today's frontier price, and the cheapest version is Chinese and open.
The subsidy shows up as price, and price is what most buyers see.
Rests on DeepSeek V4-Flash at about 1% of GPT-5.5's list price in April 2026. Wrong if Beijing stops absorbing the losses.
By 2028, a major economy bars the other side's open models from critical systems, before any shared East–West safety test exists.
Without common evaluations, security becomes a reason to split further, not a reason to cooperate.
Rests on government-device bans on Chinese AI apps already in place in several countries; no joint testing regime. Wrong if a cross-border evaluation standard arrives first.
Where the argument could fail.
The Third Stack
Countries are choosing now. The West's best answer is already an alliance.
Take Singapore, the region's most sophisticated buyer. In the 2026 ISEAS survey of regional opinion-makers, 66.3% of Singaporean respondents picked China over the US in a forced choice, up from 47.1%. AI Singapore's latest SEA-LION model is built on Qwen.
The short clock shows up here too. The US Affiliates Rule, which would stop China-exposed ventures from routing through Singapore entities, was adopted in September 2025, suspended two months later, and on 9 November 2026 suspended again until January 2027. Buyers cannot plan around a rule that keeps moving.
These buyers are not asking which superpower to trust. They want an arrangement where they do not have to answer permanently. No one offers one, so they answer by default, procurement by procurement, toward whoever shipped weights they could hold. What the West can offer them is already an alliance.
Lithography from the Netherlands, optics and light sources from Germany, equipment and materials from Japan, leading-edge fabrication in Taiwan, memory from Korea, processor IP from the UK, design and accelerators from the US. Seven jurisdictions, one supply chain. Not one of them can produce the stack alone.
The Eastern column is the opposite: one country attempting every layer. It has two layers left to solve, lithography and memory, and it is shipping everything above them at global scale.
That alliance is the strength to build on. It already runs the hardest layers in the world. The one place it has not shown up is the layer countries actually adopt: open models they can host, inspect and govern. That gap is why so many of them are drifting toward the other column.
That is the long-term asset, built with exactly the patience the policy clock lacks. It is the base the third stack builds on.
Build the third stack. Shared governance, allied supply chain.
This is not neutrality between Washington and Beijing. It is the only offer that keeps countries now choosing from defaulting to the Eastern column, because it gives them what they actually want: not an American vendor, but a seat at the table.
Chinese labs have done the world a service by opening their models. The question is not whether open wins. It is whether anyone else can offer open on a trusted supply chain with shared governance. Participating states hold real authority over data, evaluation and release. The silicon, interconnect and security review stay inside allied jurisdictions. Beijing cannot match that trade: it will not share governance, and it cannot offer allied supply.
The third stack is not a third supply chain. It shares the Western column's silicon and adds what neither column offers a sovereign buyer: open weights with an open post-training stack, on allocated capacity, under shared governance.
The unpriced cost: a divided ecosystem is less safe on both sides
Two stacks mean two sets of evaluations, two incident logs and no shared view of what a model can do. Open weights cross borders the moment they are published, and so do the risks, from cyberattacks to help with biological or chemical weapons. A model downloaded in Jakarta is a shared risk.
Washington and Beijing have agreed on almost nothing in AI. The one thing they did agree, in 2024, was that humans should stay in control of decisions to use nuclear weapons. Biological and chemical risk is the next obvious candidate, and today no one owns it.
The third stack stands on three pillars.
An open stack others can adopt
Open weights and an open post-training stack (RL environments, verifiers, evaluations) on a provenance-clean data commons, run on allocated, federated capacity across allied sites and more than one chip vendor. Governments write it into what they buy.
More intelligence per watt
Smaller, sharper models, better inference, hardware and software designed together. A rival with more power can be matched by an alliance that wastes less of it.
Shared standards and safety
Common security testing and biological and chemical risk evaluation, open to every lab and government willing to meet the standard, East included. The supply chain is allied. The safety work cannot be partisan.
What each ally brings, and what it gets.
Bring procurement commitments and public data.
Get a governance seat, and models a government can host and audit in-country.
Bring allocated capacity on hardware already deployed.
Get a global developer base building on their silicon, not a competitor's.
Bring post-training research, environments and evaluations.
Get compute and a shared open stack to publish on.
Bring catalytic capital.
Get a hedge that pays off whether AI is a race or a bubble.
The cost of not doing this is not measured in market share. It is measured in how many governments end up running public services, defence tooling and national models on a stack the United States does not supply, cannot inspect, and will not be able to price out once switching costs set.
The open layer is going to be global infrastructure either way.The only open question is whose values are compiled into it.
Governments, compute providers, model builders and funders are invited to join as founding allies. Early allies shape the governance. Inquiries: contact the author.
The working.
The working behind the argument. Open any section.
How the board splitThree acts, from the cloud war to the break
How the board split.
The cloud war and the compute war were fights over share inside one market: every vendor could sell to every buyer. The third fight is over jurisdiction. Cloud became critical infrastructure (hospital records, core banking, elections) while we argued about migration timelines. AI is following the same path faster.
The cloud war
On-premise gave way to hyperscale. Amazon, Microsoft and Google took share off every corporate data centre in the world, and the architecture that actually won was hybrid: workloads split across owned and rented capacity, with the buyer arbitrating. Today the big three hold roughly 63% of a cloud infrastructure market that grew 35% year over year to $129B in a single quarter, and about 67% of public IaaS and PaaS specifically.
The compute war
The centre of gravity moved off the general-purpose CPU. Intel's decades-long position eroded while accelerated computing — GPUs, then custom silicon — became the thing data centres were built around. Nvidia took an estimated 75–81% of AI accelerator revenue, down from a peak near 87% in 2024 as AMD established itself as a second source and hyperscalers built their own ASICs. Intel's AI accelerator share sits near 1%.
The break
While those two fights played out, export controls, retaliation and a run of sovereignty shocks did something neither of them did: they split the board. There is now a second, substantially domestic stack — not yet independent end to end, since lithography and high-bandwidth memory remain unsolved, but complete enough to run a country's AI on.
What travels with that choice is a jurisdictional question. Not automatically: open Chinese weights can run on American chips inside a European-operated cloud, and data-law exposure follows the operator, the legal control and the deployment arrangement rather than the nationality of the weights. But procurement rarely arrives disaggregated. Buyers take the accelerator, the cloud, the support contract and the export-control status as one package, and that package does carry a legal order with it.
The fracture is not a single decision. Each control produced a compliant part, each compliant part produced a new control, and a parallel run of jurisdiction and sovereignty shocks made buyers price the political risk of both columns rather than only the commercial terms.
The seven-country supply chain behind the Western column is mapped at the top of this page.
Timeline, 2018 – 2026US policy, Chinese industrial policy, sovereignty shocks
Three tracks, one outcome.
American technology policy, Chinese industrial policy and a run of sovereignty shocks moved on separate clocks and ended up in the same place. The sovereignty track is the one most often left out of the chip debate, and it is doing the most work.
The CLOUD Act becomes law
Out of the Microsoft Ireland case, the US establishes that providers subject to its jurisdiction can be compelled, through valid legal process, to produce data in their possession or control regardless of where it is stored. The scope is narrower than the shorthand suggests — it does not reach automatically to every foreign subsidiary — but the lesson allied governments took from it is the one that governs AI procurement today: an EU data centre address does not by itself settle the jurisdictional question. Sovereign-cloud programmes, GDPR Article 48 conflicts and national AI stack arguments all trace back to this line.
CHIPS and Science Act
America commits public money to domestic fabrication. Industrial policy returns to the semiconductor sector on both sides of the Pacific in the same period.
First broad export controls, and the first nerfed part
A100 and H100 exports to China are effectively banned. Nvidia responds with the downgraded A800 and H800 — the beginning of a four-year pattern in which each control produces a compliant chip and each compliant chip produces a new control.
The H800 loophole closes; the H20 appears
The permitted part gets weaker again. Chinese buyers begin treating US silicon as a supply line that can be cut at any time, which is the assumption that makes a domestic alternative worth funding at any price.
China's $47.5B semiconductor fund
The largest such vehicle in the country's history, aimed squarely at reducing dependence on foreign chipmaking.
Computing power vouchers spread
Municipal programmes across seventeen cities begin subsidising AI compute rental for small firms — Shanghai alone at ¥600M, covering up to 80% of rental fees. Idle domestic capacity is converted into a demand floor.
HBM controls added
Washington moves from restricting compute to restricting memory, the real bottleneck in Chinese accelerator production.
DeepSeek R1, and the first repricing
A Chinese open-weight reasoning model matches a frontier closed system. Nvidia loses roughly $589B of market value in a single session — the largest one-day loss in US stock market history. The open layer becomes a market-cap variable.
Even the H20 is restricted
Nvidia takes a multibillion-dollar writedown; AMD faces parallel limits on the MI308. The last broadly legal American part in China is gone.
The AI Diffusion Rule is rescinded before it takes effect
The tiered global framework — which would have reserved half of US AI chip production for domestic users and confined exports to a small circle of allies — is withdrawn. Allied capitals had already read the draft.
Beijing tells domestic firms to stop buying Nvidia
The captive market is now explicit on both sides. In the same month Qwen overtakes Llama as the most-downloaded open model family.
The GAIN AI Act passes the Senate
Bipartisan legislation requiring chipmakers to fill American orders before exporting advanced parts clears the chamber as an NDAA amendment.
And is dropped from the final bill
After lobbying by the White House and Nvidia, the provision does not survive conference. The episode is the clearest single illustration of American AI policy being unable to hold a position for a full legislative cycle.
H200 sales to China permitted for a 25% revenue share
Export policy reverses again, this time attaching a payment to the US Treasury. A separate executive order moves to preempt state AI laws, opening a fight that is still unresolved.
Greenland returns to the agenda
Following the US operation in Venezuela, the administration revives its push for control of Greenland. France, Britain, Germany, Italy, Poland, Spain and Denmark issue a joint statement on sovereignty, territorial integrity and the inviolability of borders. Neither the White House press secretary nor the Secretary of State rules out force.
Tariffs threatened against eight allies over Greenland
Denmark, Norway, Sweden, France, Germany, the United Kingdom, the Netherlands and Finland are told tariffs will begin on 1 February until the matter is resolved. Macron's response: no intimidation or threat will influence us, in Ukraine or in Greenland.
Carney at Davos: "a rupture, not a transition"
The Canadian prime minister tells the World Economic Forum that the post-Cold War order enabled by American hegemony has broken, that great powers have begun using economic integration as a weapon and supply chains as vulnerabilities, and that middle powers should combine rather than compete for favour. Reprised in Dublin ahead of the June G7: middle powers can "combine to create a third path with impact."
Commerce formalises case-by-case H200 review
Licences move from presumption of denial to case-by-case, with aggregate shipments to China and Macau limited relative to aggregate US shipments of the same product — a ceiling that would still permit very large volumes.
The Iran war closes the Strait of Hormuz
US and Israeli strikes begin. Transits through a waterway that normally carries about a fifth of global oil fall from roughly 138 a day to under five. WTI posts its biggest weekly gain since at least 1985 — over 38% in the first week — and Brent later passes $140, the highest since 2008. A record 400-million-barrel strategic reserve release fails to hold the line.
GLM-5: a frontier model with no Nvidia in the pipeline
Zhipu releases a 744B-parameter model under an MIT licence. Reuters reports it was trained entirely on Huawei Ascend chips using the MindSpore framework, with no NVIDIA hardware at any stage.
White House AI framework; Congress does not move
A national policy framework is sent to Congress. Analysts put the odds of comprehensive federal AI legislation in 2026 as very bleak, with preemption the unresolved fault line.
DeepSeek V4 and a $5.6B silicon order
V4 ships with day-zero adaptation across Ascend, Cambricon, Hygon and Moore Threads, and kernels written in TileLang rather than CUDA. ByteDance commits $5.6B to Ascend 950PR — roughly half of Huawei's annual production target.
Nine domestic chip families cleared for sensitive deployment
Huawei, Alibaba, Biren and Moore Threads parts pass a state security review qualifying them for government use.
The ¥2 trillion grid, 80% domestic
Beijing is reported to be drafting a roughly $295B five-year national computing buildout targeting at least 80% domestic technology, operated largely by state carriers. Still a draft blueprint — but if it proceeds, demand for the Eastern column stops depending on the market.
Greenland again, at the NATO summit
The claim is repeated in Ankara. Denmark's prime minister says she is ready to defend every inch of NATO including her own territory, and that the island is not for sale.
The licences exist; the chips do not move
Commerce tells Congress that H200 shipments to China have been very few despite roughly $10B in approved licences. Nvidia reports no China data-centre revenue and excludes it from guidance.
CXMT lists; chip stocks shed over $1 trillion
The Chinese memory maker rises 466% on debut to a roughly $488B valuation, near half of Micron's. Within days, US and Asian chip names lose more than $1T combined on AI financing and China competition fears; the SOX falls as much as 29% from its June peak.
GLM-5.3-Flash, served entirely on domestic silicon
The anonymous model topping coding leaderboards is revealed as a 320B MIT-licensed release scoring level with Claude Opus 4.8, having processed 62 trillion tokens on a cluster of more than 100,000 domestically produced accelerators. It is the largest launch OpenRouter has recorded.
The Affiliates Rule is deferred again
BIS extends its suspension of the look-through rule to 10 January 2027 without revising it. The deadline keeps moving, but the rule is still there.
The stack, layer by layerSilicon, memory, cloud, models, developers
Nobody buys a layer. They buy a column.
A stack is not a shopping list. Each layer sets the switching cost of the layer above it. Kernels written for one accelerator port at real expense. Models tuned to one memory profile need rework. Developer habits, once formed, are slow and costly to change. Porting is possible — compiler and framework layers exist precisely to make it so — but choosing a column is a decade-length commitment that a procurement officer makes in a quarter.
What follows walks the stack from the bottom. At each layer the same question: which column is winning the decision, and why. The answer is uncomfortable in four places and reassuring in one.
A market share collapse that was policy, not product.
Nvidia went from near-total dominance of Chinese AI compute in 2023 to roughly 40% in 2025, with Bernstein forecasting about 8% for 2026. Huawei went the other way, from close to nothing to an estimated 50–60%. No product failure caused this. Export controls removed the incumbent, and Beijing converted the vacuum into a captive market.
The 2026 figure is a Bernstein forecast, not an observed result; other market definitions produce different current estimates. Nvidia has excluded China data-centre compute from forward guidance entirely.
The mechanism is a captive market rather than a cheque. A reported draft plan would commit roughly $295B (¥2 trillion) over five years to a national AI computing grid, targeting at least 80% domestic core technology. It remains in planning. In May 2026, nine categories of domestic accelerators — Huawei, Alibaba, Biren, Moore Threads — cleared a state security review qualifying them for government and security-sensitive deployment. Demand on that side is not being left to the market.
Private capital then does the rest. ByteDance committed $5.6B in orders for Huawei's Ascend 950PR — roughly 350,000 chips, close to half of Huawei's 2026 production target. The customer is simultaneously validator and co-financier of the silicon it depends on. And the 950PR ships with a CUDA-compatible software path, which attacks the one moat export controls never touched.
The one layer where the West is still clearly ahead.
This is the honest part of the brief, and it should be said before an opponent says it. Chinese silicon is a generation behind and constrained where it is hardest to fix. One caveat on the comparison below: the 950PR is optimised for prefill and recommendation rather than general training, so it is not a like-for-like substitute for a B200 in a training cluster — Huawei's training-oriented part is the 950DT.
| Measure | Ascend 950PR | Nvidia B200 |
|---|---|---|
| Peak FP8 | 1 PFLOPS | 4.5 PFLOPS |
| Process node | SMIC 7nm | Leading edge |
| High-bandwidth memory | Domestic ramp, stockpile reliance | Secured supply |
| Developer base | CANN, porting friction reported | CUDA, 4M+ registered developers |
| Ascend 970 roadmap date | Q4 2028 — Huawei's stated schedule, not a parity claim | |
So the Eastern column does not win on peak capability and will not for at least two years. It wins on availability, price, and policy alignment — three things a ministry buying inference capacity in 2026 weighs more heavily than peak FLOPS.
Treating a two-year hardware lead as the strategy is the error. The lead is real. It is also the only thing on this page trending in the West's favour, and it does not transfer upward: a buyer who standardises on the Eastern column at the model and developer layers will not switch back when the hardware gap closes. They will already have rebuilt around it.
The distribution channel is already in the buyer's country.
Alibaba Cloud is the fourth-largest cloud provider in the world, operating in about 30 regions as of August 2026. Huawei Cloud runs 101 availability zones across 34 regions, concentrated in Asia, the Middle East and South America. New capacity keeps landing in exactly the markets that are deciding: Johor, Bangkok, the Gulf, Latin America.
The commercial engine underneath is the part policymakers routinely miss. Alibaba's Cloud Intelligence revenue reached ¥158.1B in FY2026, up 34%, with AI product revenue posting triple-digit growth for eleven consecutive quarters. Open weights are the customer acquisition cost; paid inference is the margin. Giving the model away is not generosity. It is the funnel.
US providers compete hard here, but they arrive selling a closed model on a metered API, into governments whose stated requirement is control. Chinese providers arrive with weights the ministry can hold, hosted on infrastructure the ministry can site domestically, at a price that clears a treasury review. On the specific criterion sovereign buyers say they are using, the Eastern column has the better offer.
The open layer has already flipped, and it flipped fast.
This is the layer where the argument is decided, because this is the layer that sets defaults. China accounted for roughly 41% of geographically attributed Hugging Face downloads over the trailing year. In June 2026, Chinese open models held five of the top ten trending slots.
One dataset, one metric: monthly share of newly published derivative models. Raw download counts tell a similar story — Hugging Face reports 2.061 billion Qwen downloads for January–August 2026 — but downloads are a proxy for developer attention, not for market share or commercial adoption, and vendor-reported cumulative totals are not comparable to platform-period figures.
Capability was supposed to be the West's insurance. It is thinning. Stanford's AI Index put the gap between the top American and top Chinese model at 2.7% as of March 2026. The gap between leading open models and the best closed systems has compressed from six-to-nine months to roughly two-to-three.
Then August. Zhipu revealed that the anonymous model topping coding leaderboards was GLM-5.3-Flash — 320B parameters, 18B active, MIT licence — scoring 57 on the Artificial Analysis intelligence index, level with Claude Opus 4.8. It processed 62 trillion tokens before formal release, the largest launch OpenRouter has recorded. Zhipu states the whole thing ran on a cluster of more than 100,000 domestically produced accelerators, at hardware efficiency and cost per token it claims are comparable to mainstream Nvidia GPUs.
A precision note worth keeping: Z.ai did not name the accelerator vendor in its GLM-5.3-Flash launch material, so the defensible claim there is production-scale inference on domestic silicon. The separate training claim belongs to GLM-5, released 11 February 2026, which Reuters reported was trained entirely on Huawei Ascend chips using the MindSpore framework with no NVIDIA hardware. Specific cluster sizes and fab nodes circulating for that model are secondary reporting, not primary disclosure.
DeepSeek is the more structural signal, and the one that does not reverse. V4 shipped with day-zero adaptation across Ascend, Cambricon, Hygon and Moore Threads. More importantly, its kernels are no longer written purely in CUDA but in a domain-specific language, TileLang, that compiles to different hardware. The decoupling is happening at the compiler layer, not the chip layer. Hardware leads are temporary. A portable software layer is not.
Price sets the default. The default compounds.
Open-weight API access runs at roughly one-eighth the list price of closed — about $0.23 per million tokens against $1.86. Capability follows within months. For most production workloads, the rational choice is the cheap model that will be good enough by the time the project ships.
Prices from an OpenRouter study covering May–September 2025, which measured a median capability catch-up interval of 13 weeks. Epoch AI's more recent measure puts the average gap between leading closed and open models at about four months since January 2026.
Every developer who fine-tunes on a Chinese base model this year produces the tooling, the evaluation harnesses and the tutorials that make the next developer's choice easier. Defaults are not opinions. They are accumulated infrastructure, and they are being accumulated now, in the open, at a rate no closed ecosystem can match by pricing.
Post-training, in detailWhere frontier capability now lives
The gap is not pre-training. It is everything that happens after.
Almost every proposal to help American open models assumes the problem is a big training run. It is not. Frontier capability has moved decisively into post-training — reinforcement learning, verifiable rewards, agentic environments, evaluation harnesses — and that is the one part of the pipeline the non-Chinese open ecosystem does not have.
The shift itself is not in dispute. OpenAI's Dan Roberts said in May 2025 that the lab was prioritising large-scale RL over pre-training and expected RL compute to exceed what had been spent on pre-training. Cursor disclosed that Composer 1.5 used more compute on RL post-training than on pre-training its base model — the only plainly quantified lab disclosure of the inversion. The direction of travel below is an analyst estimate, but the endpoint matches what the labs describe.
Analyst estimate for two US frontier labs combined; the final two quarters are projections and the series is not independently verified. It is included to show the shape of the shift, not as a precise measurement. The anchor facts below carry the argument.
Now the part that should worry a policymaker. Chinese open labs have built real post-training pipelines — DeepSeek, Alibaba, Moonshot, MiniMax and Z.ai have all invested heavily in post-training, coding capability and permissive release as a distribution strategy. American frontier labs have the best pipelines of all, and keep them closed. The non-Chinese open ecosystem sits in the gap between the two.
Ai2's Nathan Lambert, who led post-training on Olmo and Tülu, puts the asymmetry precisely: open pre-training infrastructure is strong — labs raising hundreds of millions simply pick up NVIDIA's Megatron-LM and make it work — while the RL revolution brought a large jump in post-training infrastructure complexity that the open side is still fragmented across many competing libraries. Prime Intellect's INTELLECT-3 report says the same thing from the builder's seat: open frameworks, RL environments, evaluations and stable recipes all have notable shortcomings against the proprietary pipelines inside frontier labs.
The asymmetry, in detailHow each column funds its open layer
One side subsidises compute. The other subsidises nothing.
~$725B, privately financed
- Buys: data centres, accelerators, power, closed frontier models
- Monetises: metered inference and enterprise contracts
- Open layer: structurally unfunded — publishing weights destroys the revenue line that paid for them
- Public backstop: NAIRR broadens access but was not built to produce frontier open models; FY2027 NSF proposals run from a $1.75B cut to a request of $3.9B
- Policy: no comprehensive federal AI statute; preemption fight unresolved; analysts call 2026 federal legislation unlikely
Captive demand, not a cheque
- Buys: a ¥2T national grid with an 80% domestic-content floor
- Monetises: open weights as top-of-funnel, paid cloud inference as the margin
- Open layer: a national distribution asset, so releasing it is the strategy rather than a cost
- Public backstop: municipal compute vouchers across 17+ cities — Shanghai alone at ¥600M, covering up to 80% of AI rental fees
- Policy: single multi-year plan, security review clearing nine domestic chip categories for sensitive deployment
"We out-invest them ten to one" is true and beside the point. Capex does not travel. Weights do.
The physical constraint, in detailGrid queues, electricity politics, fabs
Rich in compute, short on new capacity.
The numbers underneath are stark. Roughly 2,000 gigawatts of generation and storage are actively seeking connection to the US grid — about double the capacity of the entire existing US power plant fleet. Historically, only 13% of the capacity that entered the queue between 2000 and 2019 had reached commercial operation by the end of 2024, while 77% was withdrawn. ERCOT was tracking a large-load queue near 410 GW as of April 2026, with data centres accounting for around 87% of it. PJM missed its reliability target by 6,625 megawatts in its December 2025 auction — the first shortfall in the operator's history.
This is already biting the largest buyers. On Microsoft's January 2026 earnings call, CFO Amy Hood told investors that demand continues to exceed available supply and that Azure capacity constraints — driven by power and space rather than chip procurement — would persist at least through June 2026, against a commercial backlog that had more than doubled to $625 billion. Of the US data-centre capacity expected in 2026, only about a third is under active construction. A campus joining the Northern Virginia queue in mid-2026 cannot realistically expect utility power before 2030 to 2033, regardless of how much capital stands behind it.
The political ceiling arrived early
Even where the engineering can be solved, consent is running out first. Utilities requested a record $31 billion in rate hikes in 2025, more than double the prior year. Residential electricity prices rose about 7% over 2025, and roughly 7.3% in the twelve months to April 2026. A March 2026 Gallup survey found seven in ten Americans oppose data centre construction in their own communities, and community pushback blocked or delayed at least 75 projects worth roughly $130 billion in the first quarter of 2026 alone.
New York has ordered the first statewide moratorium on new hyperscale facilities. At least eighteen states have introduced special rate-class legislation, with moratorium bills filed in several more. Rising electricity rates became a centrepiece of the 2026 affordability debate. The buildout has become an affordability question, which means its pace is set by voters rather than by capital markets.
Fabrication is no easier. A single leading-edge fab costs $15–20B before tools arrive. TSMC's first Arizona fab slipped from 2024 to 2025 and the second from 2026 to 2027–28, with construction running 30–50% above the cost of equivalent facilities in Taiwan. McKinsey and SEMI project a US shortfall of roughly 157,000 skilled semiconductor workers. Reshoring the physical base is correct policy and it is a decade-long project.